000 01407cam a2200253 a 4500
005 20230110150225.0
008 120518s2011 enkm b a001 0 eng
010 _a2010-049003
020 _a0566091666 (hbk. : alk. paper)
020 _a1409428125 (ebook)
020 _a9780566091667 (hbk. : alk. paper)
020 _a9781409428121 (ebook)
050 0 0 _aHD69.P75
_bH85 2011
100 1 _aHulett, David T.
245 1 0 _aIntegrated cost-schedule risk analysis /
_cDavid Hulett.
260 _aFarnham, Surrey ;
_aBurlington, VT :
_bGower,
_cc2011.
300 _axix, 218 p. :
_bill. ;
_c25 cm.
504 _aIncludes bibliographical references and index.
505 0 _aWhy conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis.
650 0 _aCosts, Industrial.
650 0 _aProject management
_xCost control.
650 0 _aRisk assessment.
942 _2lcc
999 _c60346
_d60346